Started to set up the various bits of plumbing related to things underwater and undergravel. The drainpipes connect up to a riser with a checkvalve. The 2″ pipe from the skimmer also joins up on the riser. This will go over to the pump to be installed next year. A 1″ pipe returns from the pump to send 2 jets of water into the deep part of the pond to aid circulation.
August 22, 2014
Leave a Comment »
No comments yet.
Leave a Reply