Around the Bend Strawbale House, Pond and Gardens

July 19, 2014

Liner install

Filed under: Uncategorized — aroundthebend @ 9:03 pm

First we had to roll the liner out across the bottom of the pond — 1200 plus lbs..  Then hoist it with the skidsteer up onto the outside of the wall.  We hoped we could just unroll what we needed from the roll at that point, but we in fact needed to unroll it down the hill outside the pond and then hoist it in sections to adjust.

IMG_4902 IMG_4913 IMG_4915 IMG_4920 IMG_4922 IMG_4938

Next came the big moment, measure several times.. cut once..

IMG_4953 IMG_4955

and we are ready for unfolding…

IMG_4946 IMG_4947

for the unfolding we did a little time lapse movie.

watch it here.

And then a few pics of the results… it was a terribly hot day, in a pit, and with a very hot liner.

IMG_4958 IMG_4959 IMG_4961

 

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: