July 16, 2014

Getting ready for liner — yet more

Filed under: Uncategorized — aroundthebend @ 8:31 pm

We’ve also worked to finish all the bags around the bottom for the wooden wall.

IMG_4823 IMG_4824 IMG_4837 IMG_4827IMG_4834

Then we finished all the bags around the top edge finalizing the water line. And finally double checked the levels to ensure we had an even top line all the way around.

IMG_4877 IMG_4878 IMG_4851 IMG_4854 IMG_4864 IMG_4876

 

 

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: