Around the Bend Strawbale House, Pond and Gardens

November 19, 2007

Camel’s Back Dance

Filed under: Uncategorized — aroundthebend @ 10:45 pm

tina-and-putz.jpgtola-power-trowels-tim-lugs-the-hose.jpgmike-does-knockdown.jpgjd-as-second-troweller.jpgpete-master-finisher.jpgpete-monica-mike-perfect-the-wall.jpgjd-reveals-the-bottle-lights.jpgpete.jpgperfect-curves.jpg

Just give them what they need – neatly piled bags of cement/lime mix, finely screened mortar sand, and lots of fresh clean water — then stand back and watch the performance.  Master mixer Tina from Camel’s Back Construction feeds the Putz.   The heavy plaster is pumped through a hose and trowelled onto the wall by the power troweller and “hose monkey”, interchangeable roles played by Tola and Tim.  Then Mike comes along to “knock down” the roughly applied mud to where it belongs on the wall.  “Second troweller” Monica or JD smooths and shapes the plaster for Pete, who follows behind to give the walls their final beautiful finish.  The challenging compound curves of our interior wall reveal the skill and expertise of this plastering team!

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: