The interior curved bale wall, with built in shelf, surrounding Marianne’s studio is starting to take shape.
October 27, 2007
Garage insulation
The walls between the garage and the house needs to have R29 so we have rigid insulation in the garage (covered with drywall later) and then roxul in our 2×6 wall, then vapour barrier and then drywall. Joel is back installing drywall again.
October 23, 2007
October 16, 2007
October 7, 2007
Septic and trenching for the well
The big machine was back to excavate and deposit the septic tanks in the ground. We also had a trench dug from the well to the house in anticipation of hooking up the water supply to the house soon.