Around the Bend Strawbale House, Pond and Gardens

September 17, 2007

rough in plumbing is passed

Filed under: Uncategorized — aroundthebend @ 7:46 pm

Dennis finished off the vent pipes for the plumbing and filled the whole system with water to check for leaks… he seems happy with the results.  Then he did the supply piping out of pex, some of the leftover pex from the radiant floor system and other.  We set it up as a “homerun” system with a direct pipe from the manifolds in the utility room to each sink or toilet.  There is a separate manifold in the kitchen for the different needs there.

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: