more floor prep

Filed under: floor — aroundthebend @ 9:15 pm

junee-002.jpgjunee-013.jpgjunee-014.jpgjunee-006.jpg

Well, we’re getting closer to being ready to pour the floor.  Lots of little steps to take.   Dennis and Harry think about how to build the form for the concrete for the entryway, which is taken from the garage area.  The garage floor is required to be six inches lower than the house floor so that fumes do not enter the house.  They use leftover pieces of Nudura, stabilized with leftover pieces of rebar, and lots of wire.

The radiant tubes from all the house zones go through the same doorway to the manifold. Ben the plumber suggested we insulate those tubes to prevent the floor above them from becoming uncomfortably hot.

Harry pressurizes the tubes to test for possible leaks and checks all the connections with soapy water. 

And now some more foam to fill the cracks between the insulation.

Leave a Comment »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: